Stay Compliant. Protect the Environment.

Pollution Control Certificate (CTE/CTO)

Ensure your business is environmentally compliant with our expert-led services for Consent to Establish (CTE) and Consent to Operate (CTO).

Select Your Fee Type

Choose the required consent and your industry's investment scale. The price and details will update on the right.

  • For all SPCB/PCC across India.
  • Covers Red, Orange, Green categories.
  • 100% Online process.
  • Expert support included.

Plan Details

Please select a certificate type from the left card to see the price and details.

₹---- / one-time
Select a certificate type
Select Plan
  • Eligibility Check & Consultation
  • Documentation Preparation & Review
  • Application Filing with SPCB/PCC
  • Site Inspection Coordination
  • Consent Order Issuance
  • Expert Legal & Compliance Assistance

Advantages of Pollution Certificate:

  • Industrial operations: Certain industries, such as chemical manufacturing or oil refining, may produce pollutants as a byproduct of their operations. A pollution certificate, or similar permit or license, may be required to ensure that the business is controlling its emissions and operating in compliance with environmental regulations.
  • Waste management: Businesses that handle hazardous or toxic waste may require permits or certifications to ensure that they are properly disposing of the waste in a way that does not harm the environment or public health.
  • Construction and development: Large-scale construction projects may generate dust, noise, and other pollutants that can impact air and water quality. A pollution certificate or similar permit may be required to ensure that the construction company is mitigating these impacts and complying with environmental regulations.
  • Service includes consultation, documentation review, application filing, and coordination with the respective State Pollution Control Board (SPCB) or Pollution Control Committee (PCC).
  • The prices listed are professional fees only and do not include any government fees, challans, or inspection fees.
  • Government fees are determined by the SPCB/PCC based on the industry category (Red, Orange, Green, White) and the gross fixed investment of the unit.
  • The applicant is responsible for providing accurate details regarding their industrial activity, investment, and site location.
  • A full refund of the professional fee will be issued if the service is canceled before any documents are prepared or the application is filed.
  • Once the application is drafted and filed with the SPCB/PCC, the professional fee is non-refundable.
  • All fees paid to the government or any third-party bodies (like testing labs) are strictly non-refundable under any circumstances.